Etihad Railway sleeper facility
The profile records design, supply and installation of fire protection, a clean agent system and a fire pump set for a sleeper manufacturing and assembly facility in 2012–2013.
Fire protection. Technical expertise. A safer tomorrow.
The profile records design, supply and installation of fire protection, a clean agent system and a fire pump set for a sleeper manufacturing and assembly facility in 2012–2013.
The profile lists a 2013–2014 project at Ruwais refinery covering fire protection design, supply and installation, including clean agent and fire pump systems.
The profile lists maintenance of fire detection systems for ADNOC Distribution petrol stations in the UAE.
Tell us the asset, location and systems you are procuring. Ask for details relevant to the specific delivery scope.
From requirement to the right solution
A model code, a drawing or a maintenance requirement.
Tell us what you need. We’ll help you move forward.